Sunday 17 December 2023

Inter/ Adv - Week of Dec.18th


Your priority this week should be Programing.  Everyone should complete the Developing level of programing for their area of choice.

I will be coming around for a interview to give you a preliminary mark in all 5 credits.

For TD reassessment:

  • Take a multi part design
  • Export tile blocks for each component
  • Export a tile block for it assembled
  • Exemplary Example

How to video 1

How to video 2

Assessment

FOCUS THIS WEEK:

 Identify sensor control systems and subsystems used in robotic systems Explain sensory control circuits and components used in the robotic control system

Operate and demonstrate the capabilities of a robotic system equipped with sensor controls

Evidence in portfolio:

Monday 11 December 2023

Files for Drive Base Design

 Files for Drive Base Design:

To follow todays tutorial:

  1. Create a new drive base folder in your Fusion360
  2. Upload the parts found in this folder